Therefore the Piping Arrangement show parts of a process plant. Important details are often in a larger scale in the same drawing shown.Įven as a Plot Plan, a whole process plant usually can not be given on a readable drawing. Alloy steel and other special materialsįurther (if possible) all equipment, instrument connections, with the tag numbers will be shown on a Piping Arrangement.Order of importance of pipe lines in a Piping Arrangement. The major primary beams and secondary beams are also shown, even as Utility stations so that the most efficient route for utilities can be determined. Process equipment and piping have priority on the Piping Arrangement. In complex systems, where orthographic views do not illustrate the details of the design, pictorial view in isometric presentation is made for clarity. Orthographic drawings are views (front, side, top etc.) of an piping system, and in Piping they are called 'Piping Arrangements'.Īn orthographic view shows only one side, and therefore multiple drawings (views) are necessary to show a complete Piping Arrangement. There are two types of views in hand-drawn piping drawings. Piping Arrangement Views in Piping Drawings